CSV Software Testing Life Cycle V Model



The V-model is a type of SDLC model where process executes in a sequential manner in V-shape. It is also known as Verification and Validation model. It is based on the association of a testing phase for each corresponding development stage. Development of each step directly associated with the testing phase. The next phase starts only after completion of the previous phase i.e. for each development activity, there is a testing activity corresponding to it.




  • The left side of the model is Software Development Life Cycle - SDLC
  • The right side of the model is Software Test Life Cycle - STLC
  • The entire figure looks like a V, hence the name V - model

Apart from the V model, there are iterative development models, where development is carried in phases, with each phase adding a functionality to the software. Each phase comprises its independent set of development and testing activities.
Verification: It involves static analysis technique (review) done without executing code. It is the process of evaluation of the product development phase to find whether specified requirements meet.
Validation: It involves dynamic analysis technique (functional, non-functional), testing done by executing code. Validation is the process to evaluate the software after the completion of the development phase to determine whether software meets the customer expectations and requirements.

What is Software Testing Life Cycle (STLC)?

Software Testing Life Cycle refers to a testing process which has specific steps to be executed in a definite sequence to ensure that the quality goals have been met. In the STLC process, each activity is carried out in a planned and systematic way. Each phase has different goals and deliverables. Different organizations have different phases in STLC; however, the basis remains the same.


Below are the phases of STLC:
  1. Requirements phase
  2. Planning Phase
  3. Analysis phase
  4. Design Phase
  5. Implementation Phase
  6. Execution Phase
  7. Conclusion Phase
  8. Closure Phase
1. Requirement Phase:

During this phase of STLC, analyze and study the requirements. Have brainstorming sessions with other teams and try to find out whether the requirements are testable or not. This phase helps to identify the scope of the testing. If any feature is not testable, communicate it during this phase so that the mitigation strategy can be planned.

Activities
  • Identify types of tests to be performed. 
  • Gather details about testing priorities and focus.
  • Prepare Requirement Traceability Matrix (RTM).
  • Identify test environment details where testing is supposed to be carried out. 
  • Automation feasibility analysis (if required).
Deliverables
  • RTM
2. Planning PhaseIn practical scenarios, Test planning is the first step of the testing process. In this phase, we identify the activities and resources which would help to meet the testing objectives. During planning we also try to identify the metrics, the method of gathering and tracking those metrics.
On what basis the planning is done? Only requirements?
The answer is NO. Requirements do form one of the bases but there are 2 other very important factors which influence test planning. These are:
Activities
  • Preparation of test plan/strategy document for various types of testing
  • Test tool selection
  • Test effort estimation
  • Resource planning and determining roles and responsibilities.
  • Training requirement
Deliverables
  • Test plan /strategy document.
  • Effort estimation document.
3. Test Case DevelopmentThis phase involves the creation, verification and rework of test cases & test scripts. Test data, is identified/created and is reviewed and then reworked as well.

Activities
  • Create test cases, automation scripts (if applicable)
  • Review and baseline test cases and scripts
  • Create test data (If Test Environment is available)
Deliverables
  • Test cases/scripts
  • Test data

4. Design Phase:
This phase defines “HOW” to test. This phase involves the following tasks:
– Detail the test condition. Break down the test conditions into multiple sub-conditions to increase coverage.
– Identify and get the test data
– Identify and set up the test environment.
– Create the requirement traceability metrics
– Create test coverage metrics.
5. Implementation Phase:
The major task in this STLC phase is of creation of the detailed test cases. Prioritize the test cases also identify which test case will become part of the regression suite. Before finalizing the test case, It is important to carry out the review to ensure the correctness of the test cases. Also, don’t forget to take the sign off of the test cases before actual execution starts.
If your project involves automation, identify the candidate test cases for automation and proceed for scripting the test cases. Don’t forget to review them
Activities
  • Understand the required architecture, environment set-up and prepare hardware and software requirement list for the Test Environment.
  • Setup test Environment and test data
  • Perform smoke test on the build
Deliverables
  • Environment ready with test data set up
  • Smoke Test Results.

5. Test Execution :During this phase, the testers will carry out the testing based on the test plans and the test cases prepared. Bugs will be reported back to the development team for correction and retesting will be performed.
Activities
  • Execute tests as per plan
  • Document test results, and log defects for failed cases
  • Map defects to test cases in RTM
  • Retest the Defect fixes
  • Track the defects to closure
Deliverables
  • Completed RTM with the execution status
  • Test cases updated with results
  • Defect reports

6.Test Closure:- Testing team will meet, discuss and analyze testing artifacts to identify strategies that have to be implemented in the future, taking lessons from the current test cycle. The idea is to remove the process bottlenecks for future test cycles and share best practices for any similar projects in the future.
Activities
  • Evaluate cycle completion criteria based on Time, Test coverage, Cost,Software, Critical Business Objectives, Quality
  • Prepare test metrics based on the above parameters.
  • Document the learning out of the project
  • Prepare Test closure report
  • Qualitative and quantitative reporting of quality of the work product to the customer.
  • Test result analysis to find out the defect distribution by type and severity.
Deliverables
  • Test Closure report
  • Test metrics
6.Conclusion :- Lets Go to Validation Summery Report
     Note :- This is Only Knowledge Purpose and Blog Contain is my View  + Internet Search and Guideline.
Reactions

Post a Comment

5 Comments

  1. Anyone looking for Best Consulting Firm for Fake Experience Certificate Providers in hyderabad, India with Complete Documents So Dreamsoft Consultancy is the Best Place.Further Details Here- 9599119376 or VisitWebsite-https://experiencecertificates.com/experience-certificate-provider-in-Hyderabad.html

    ReplyDelete
  2. Thanks for posting these kinds of post its very helpful and very good content a really appreciable post apart from that if anyone looking for Python training institute in delhi so contact here +91-9311002620 visit https://www.htsindia.com/Courses/python/python-training-institute-in-delhi

    ReplyDelete
  3. Thank you for sharing such a useful article. I had a great time. This article was fantastic to read. Continue to publish more articles on

    Data Engineering Services 

    Data Analytics Solutions

    Data Modernization Solutions

    AI & ML Service Provider

    ReplyDelete
  4. Thanks for sharing such valid informative post. In this post clearly explains the process. Keep sharing the post like this.
    Low code development services
    Mendix Services

    ReplyDelete