Ticker

6/recent/ticker-posts

Change Proposal Template for Changes in the Computerized System

Title

Change Proposal Template for Changes in the Computerized System


Document no (If Any):

Revision No.

Last Changes Brief

Area

Production Block

CCF No.

Revision -1

1.      Capture at least latest 3-5 changes or as per respective organization procedure

 

 

Revision -1…. n

1.       

 

 

Section 1

Initial issue / Changes

 

 

System name / Area /

Software name / Version no

 

Ref documentation

 

CCF number <for current changes>:

Description of changes :

1.      <Details of proposed changes along with current status>

Documentation:

1.      <Impacted Documents and all required documents>

Section 2: Impact Assessment for Proposed change

Proposed Change (enter reason if no change is proposed):

Impact Assessment - State Effect of Change on the following:-

1.      Impact assessment for proposed changes (i.e. Procedure, control, logic etc).

Software (reference modules if applicable):
<Describe Software affected area>

S. No.

Description                                                                          

Addition / Replication

Deletion

Modification

1

<Applicable Equipments>, <Graphics>, <Historian tags>, <Batch configuration>, <Recipe>                                                                              

<Addition of new fubctionality or replication of existing configuration or logic to other equipment>

<Deletion of any functionality or logic>

<Modification in functionality or logic>

Hardware: <Addition / Deletion / Modification in any Hardware>

Software:

<Describe Software Testing requirement>

Section 3: Vendor / OEM / Consultant recommendation to proceed (If any)

Vendor / OEM / Consultant recommendation of Proposed Change: Recommended / Not-Recommended / Not Applicable

Vendor / OEM / Consultant recommendation: Yes / No                                                               

Priority: High / Medium / Low

Comments: 

 

 

                                              Sign / Date (Vendor / OEM / Consultant recommendation)

 

 

Prepared by / Reviewed by / Approved by:

<Approvals>

 


Reactions

Post a Comment

0 Comments