Required IQ Test for Manufacturing System Category-4
Required Test Script for Manufacturing
Category 4 System |
|||
Sr. No. |
Test Step |
Test Description |
Detail Description |
1 |
Test Step-1 |
Test User
Creation for Validation Activities |
Create
Test Validation User ID With Assign
Privilege for Validation Activity |
2 |
Test Step-2 |
Verification
for Identification of System Under Qualification. |
describe
identification of the equipment control system and its location. i.e
Equipment ID , System ID, Name of Manufacture, System Serial No., Equipment
Serial no. and Location etc. |
3 |
Test Step-3 |
Verification
of Master Documents and Vendor Supplied Material |
Verified Vendor Supplied Document i.e User Manual,
Wiring Diagram, Application and Logic
Program Backup (Backend and Frontend)OS Recovery Tool, Software
License Document/CD etc. |
4 |
Test Step-4 |
Verification
of Hardware
Component |
Verify
Hardware Component Install in Machine or Equipment,
i.e. PLC Processor/ SCAD Make Model and
Serial no. Quantity. Verify All Electronic
Component associate with system |
5 |
Test Step-5 |
Verifications
of Communication Cable |
verify
the communication cable used for interfacing between system components, i.e
PLC SCADA Communication, VFD Communication etc. |
6 |
Test Step-6 |
Verifications
of Power Utilities and Power circuits
Protection
|
verify
that the electrical utility has been installed and is available as specified
and protection device installed i.e
Utility Power, PLC, IPC Power , UPS Power Supply, Availability of power circuit
protection like MCB/MPCB/Filter
|
7 |
Test Step-7 |
System Environment Conditions |
verify
control system panel area and IPC environmental conditions. like Record temperature & relative humidity
of system area where the PLC and IPC installed.
|
8 |
Test Step-8 |
Verifications of Operating system (OS) Configuration
of PC & Installed Software’s.
|
Verify
the OS configuration. (i.e. Processor, RAM, Hard Disk Capacity, Operating
System etc). Verify
the installed software packages of IPC with installation path.
|
10 |
Test-Step-9 |
General System
Inspection for Control Panel
|
Verify for system cleanliness break free wiring,
Cleaning, Damage, Name plate, proper cable identification, etc. |
11 |
Test Step-10 |
Verifications
of Available Program Backup for PLC and SCADA |
availability
of Editable program backup & software of PLC and SCADA With Backup Size,
File name, type of Backup media, no. of backup media, backup media Location. |
12 |
Test Step-11 |
Verification
of IP Address |
Verify
IP Address PLC to IPC and Network IP Address . |
13 |
Test Step-12 |
Verification
of System Domain |
Verification
System Domain or Not. |
14 |
Test Step-13 |
Maintenance
Calibration Schedule |
Verify
Maintenance SOP with Verify the Calibration Schedule with Master List and
Certificate Associate with the system. |